Construction Business Loans: Matching Each Cash Gap to the Right Money
Construction business loans come in six main forms: business lines of credit, term loans, SBA 7(a) loans and CAPLines, equipment financing, factoring of approved pay applications, and merchant cash advances. The right one depends on which cash gap you are filling, because payroll between pay apps, mobilizing a new job, buying an excavator and carrying retainage are different problems that get repaid from different places. For an established general contractor or subcontractor, a revolving line of credit sized to the low point on your jobs usually does more work than any lump sum, with equipment financing for machines and SBA money for real estate and planned growth. The expensive mistakes are sizing a loan to the contract instead of the gap, and repaying daily debits out of income that arrives as a few late checks a month.
The short version: Find your peak cash gap first: monthly job costs times the months from your first cost to your first check, which comes to about $170,000 on the $480,000 subcontract worked through below. Cover that gap with a line of credit (or factoring of approved pay apps if you can't get a line yet), finance machines over their working life, and use SBA loans for a yard, a shop or a big expansion. Keep short-term debt light in bid season, because your surety reads the same balance sheet your lender does. Take a merchant cash advance only when you can name the check that pays it off.
Part of our industry guide: Industry Financing.
Last updated ยท Reviewed by Cody Dreis
75+ Lenders|Decisions typically in 24 to 48 hours*

Construction business loans by need: which product fits which cash gap
Start with the need, not the product. Each row below names a cash problem contractors run into, what is really going on underneath it, and the money that usually fits.
| Need | What is really happening | Best fit | Also works | Usually a poor fit |
|---|---|---|---|---|
| Payroll gap between pay apps | Crews are paid weekly; the GC or owner pays monthly, weeks after you bill | Revolving line of credit | Factoring of approved pay apps | Merchant cash advance, which debits while you wait |
| Mobilization costs | Insurance, deposits, site setup and the first month of labor land before the first billing | A draw on your line | Short-term loan sized to the job's gap | A loan sized to the contract value |
| Materials for a job | The supplier wants payment before your billing cycle catches up | Supplier credit terms, then the line | SBA Contract CAPLine on a large job | Stacked advances |
| Equipment | A machine you will run most weeks for years | Equipment loan or lease | SBA 7(a) for a fleet bought with a yard | Working capital money meant for payroll |
| Bonding capacity | The surety wants more working capital before it backs bigger work | Long-term debt instead of short-term debt; a bank line the surety can see | SBA Surety Bond Guarantee program | Short-term advances during bid season |
| Retainage | Part of every billing is held until closeout | Size the line to carry it; negotiate release terms | Factoring for the rest of the pay app | Expecting a lender to advance on held retainage |
| A new contract bigger than usual | The gap grows with the job, and bonds may be required | Line increase or SBA Contract CAPLine | Term loan backed by your backlog | An advance sized to the contract |
| Slow season | Billings drop in winter or the rainy months while overhead keeps running | Line kept open for the off-season, or a Seasonal CAPLine | Seasonal payment schedule on equipment, where offered | New short-term debt due during the slow months |
| Yard, shop or office | Long-lived real estate you will occupy | SBA 504 or 7(a) | Bank commercial mortgage | Anything short-term |
Decision rule: match how the money gets repaid to what it buys. Money that a specific pay app will repay should come from something that revolves. Money that years of machine or building use will repay should come with years of term.
Why profitable construction jobs run short of cash
A contractor pays crews every week and suppliers on 30-day terms, but bills once a month on a pay application that the GC or owner reviews, approves and pays weeks later. Part of each billing is held back as retainage. Subcontractors often wait longer still, because their contract ties payment to the GC being paid.
The result is a job that shows a profit on paper and drains the bank account for most of its life: Every new job opens a new gap before the last one closes, so growth makes it worse.
Pay applications and progress billing
Most commercial work bills monthly against a schedule of values, often on AIA G702 and G703 forms: the share of each line item complete, less retainage and prior billings. The GC or architect reviews it, may cut it, and the owner pays on its own cycle. Our guide to accounts receivable financing for construction walks through a G702 line by line.
Federal jobs run on a clock: progress payments are due 14 days after the billing office receives a proper request, and the prime must pay its subs within 7 days of being paid (FAR 52.232-27). Private jobs follow the contract and state prompt-pay laws, so read the payment clause before you price the job.
Retainage: how much is held and what the law allows
Retainage (retention) is a percentage of each progress payment held until the job is finished, and GCs pass it down to their subs. It is money you have earned and can't spend, and the legal limits differ by state and by whether the job is public or private.
| Rule | Applies to | Limit or requirement |
|---|---|---|
| FAR 32.103 | Federal construction contracts | Retainage may not exceed 10% of the approved estimate, and is paid promptly once the contract is complete |
| California Public Contract Code 7201 | California public works, down the subcontract chain | 5% of each payment and of the contract price, with narrow exceptions for complex projects |
| California Civil Code 8811 | California private works contracts entered on or after January 1, 2026 | 5% cap, with exceptions such as residential projects of four stories or fewer that are not mixed-use |
| New York General Municipal Law 106-b | New York municipal public improvement contracts | 5% of each progress payment (up to 10% if full bonds aren't required); the contractor pays subs within 7 calendar days of being paid |
| Texas Property Code 53.101 | Texas private projects where a mechanic's lien can be claimed | The owner must retain 10% of the contract price until 30 days after the work is completed |
What retainage means for borrowing: in the example job below, $48,000 of retainage sits with the GC against a $72,000 profit, so two-thirds of what the job earns arrives only at closeout. Most lenders leave held retainage out of a borrowing base, so plan it as a separate, slow receivable and push for release at substantial completion.
Lien waivers and pay-when-paid clauses
Most GCs won't release a payment until you sign a lien waiver. A conditional waiver takes effect only once you are paid; an unconditional one gives up your lien and bond rights when you sign. California's statutory unconditional form warns that it is enforceable against you even if you have not been paid (California Civil Code 8134), so sign unconditional waivers only after funds clear, because those rights are part of what makes your receivable collectible.
Many subcontracts also say the GC pays you when, or only if, the owner pays the GC, and states treat those clauses differently. Either way, your receivable is only as good as the owner's payment habits, so lenders will ask who the owner is, not just who the GC is.
Compare your options side by side
Enter your revenue and see how each type of funding sizes up.
Worked example: cash flow across a six-month subcontract
Here is an example with stated assumptions, not a quote. An electrical sub signs a $480,000, six-month subcontract and bills $80,000 at each month end. The GC holds 10% retainage, pays 45 days after each billing, and releases retainage 60 days after the last billing. The sub spends $68,000 a month on labor and materials, spread evenly through the month.
| Month | Costs paid | Payments received | Cash position at month end |
|---|---|---|---|
| 1 | $68,000 | $0 | minus $68,000 |
| 2 | $68,000 | $0 | minus $136,000 |
| 3 | $68,000 | $72,000 (pay app 1, day 75) | minus $132,000 |
| 4 | $68,000 | $72,000 (day 105) | minus $128,000 |
| 5 | $68,000 | $72,000 (day 135) | minus $124,000 |
| 6 | $68,000 | $72,000 (day 165) | minus $120,000 |
| 7 | $0 | $72,000 (day 195) | minus $48,000 |
| 8 | $0 | $72,000 (day 225) plus $48,000 retainage (day 240) | plus $72,000 |
The low point is about $170,000 on day 75, just before the first check lands: That is two full months of costs ($136,000) plus half of month three ($34,000). The gap barely shrinks after that: the account is still about $158,000 short just before the day-165 payment, and the profit turns into cash only in month eight.
Quick estimate: monthly job cost times the months from first cost to first check. Here that is $68,000 times 2.5, or $170,000, about 35% of the contract. If your request is close to the full contract value, it is sized wrong, and a lender who knows construction will see that.
What a line of credit costs on this job
Say the sub draws on a line for whatever the account is short each day, at 9% (an assumption for the example, not a market rate). The balance peaks near $170,000, averages about $94,000 over the 240 days, and the interest comes to about $5,500. Because each check pays the line down, the sub pays only for the days it uses the money; the advance section below runs the same job with a merchant cash advance.
Lines of credit for contractors: how lenders size, test and renew them
A line of credit fits construction's cash pattern better than any other product: draw for payroll and materials, pay it down when the pay app clears, and draw again on the next job. The hard part is qualifying and keeping it, because a contractor line comes with sizing rules, reporting and an annual review. Our business line of credit guide covers the basics; this section covers what is different for contractors.
How lenders size a contractor's line
A cash-flow line is sized from your financial statements: revenue, profit, existing debt payments and working capital. The bank wants to see that your profit, after other debt payments, could pay the line down if it had to.
An asset-based line, also called a borrowing base line, is sized from your receivables. You report your AR aging, the lender strips out ineligible accounts, and you can borrow a set percentage of what is left. The OCC's examiner handbook says common advance rates run 70% to 85% of eligible receivables on bank asset-based loans (OCC Comptroller's Handbook, Asset-Based Lending), and your availability is the lower of the line limit and that borrowing base.
What lenders leave out of a contractor's borrowing base
The OCC handbook lists receivables that are commonly ineligible, and several show up in construction all the time:
- Aged accounts: normally ineligible once past due by three times the terms, which is 90 days on 30-day terms.
- Cross-aged accounts: many agreements knock out all of a customer's balance once part of it goes ineligible.
- Concentrations: a bank normally treats any customer at 10% or more of receivables as a concentration, and the handbook suggests capping such accounts at 10% to 20% of the borrowing base or advancing less against them. A sub doing half its work for one GC feels this directly.
- Unbilled receivables: work done but not yet billed (an underbilling on your WIP schedule) doesn't count.
- Government receivables, because of the Assignment of Claims Act's documentation rules, unless the lender deliberately makes them eligible.
- Retainage, in practice, because it isn't payable until closeout (lender policy rather than an OCC list item).
- Bonded-job receivables, at some lenders. A payment-bond surety that pays your suppliers can step into their rights to the contract funds the owner still holds, a priority the Supreme Court upheld in Pearlman v. Reliance Insurance Co. in 1962.
Worked example: a concrete sub's borrowing base
Example inputs, not a quote. A concrete sub has a $400,000 line and $520,000 of receivables. Of that, $50,000 is retainage and $30,000 is more than 90 days past due, all owed by one GC that also owes $40,000 of current billings. The lender advances 80% of eligible receivables.
| Step | Amount |
|---|---|
| Total receivables | $520,000 |
| Less retainage | minus $50,000 |
| Less accounts more than 90 days past due | minus $30,000 |
| Less the same GC's current balance (cross-aging) | minus $40,000 |
| Eligible receivables | $400,000 |
| Advance rate (example) | 80% |
| Borrowing base, and what the sub can draw | $320,000 |
The lesson: one slow GC cost this sub $56,000 of availability ($70,000 of receivables times 80%), even though most of that GC's balance was current. Collect old balances before they age past 90 days, and show retainage on its own line in the aging so it isn't mistaken for a past-due account.
Revolving vs. non-revolving lines
A revolving line lets you borrow, repay and borrow again up to the limit for the life of the line. A non-revolving line lets you draw up to the limit, but each repayment permanently reduces what's available, which suits a single contract or a single equipment program. SBA's Contract and Seasonal CAPLines can be set up either way (SBA 7(a) terms).
Annual reviews, covenants and reporting
Many bank lines run for a year and renew only after the lender reviews your year-end statements, WIP schedule and tax returns, so a bad year or a big job writedown can bring a smaller line or a non-renewal. Some lenders also expect the line paid to zero for a stretch each year (a clean-up period), to show it funds short-term gaps rather than permanent capital.
Lines usually carry financial covenants, such as a minimum debt service or fixed charge coverage ratio, a minimum tangible net worth or a maximum debt-to-worth ratio; the OCC notes a minimum fixed charge coverage ratio is the typical one on asset-based loans. Breaking a covenant is a default even when every payment is on time, so negotiate levels you can meet in a bad year. Asset-based lines add a borrowing base certificate, field exams and often a lockbox, which the OCC calls an integral part of asset-based lending.
Contractor credit lines compared
| Option | Sized by | Revolves? | What you report | Fits best |
|---|---|---|---|---|
| Bank cash-flow line | Profit, debt service and working capital | Yes | Year-end statements, WIP, covenant tests | Established firms with clean CPA statements |
| Asset-based line | Eligible receivables times the advance rate | Yes | Borrowing base certificate, AR aging, field exams | Growing firms with good receivables and thinner profit |
| SBA Contract CAPLine | The costs of specific contracts | Revolving or non-revolving | Contract budgets and job status | A contract bigger than your normal line |
| Pay-app factoring | Each approved pay app | Grows with billing | Each pay app and lien waiver | Subs with strong GCs and no line yet |
| Short-term loan | Revenue and bank deposits | No | Usually just the payments | One dated gap with a known payoff |
If a bank says no to a line: ask why. A thin balance sheet points to factoring or a short-term loan sized to one job while you build history; messy books point to fixing your WIP schedule first.
Term loans and SBA loans for construction companies
Term loans
A term loan pays out a lump sum repaid on a fixed schedule. It fits a one-time need with a clear payback, such as buying out a partner, refinancing expensive short-term debt or opening a branch, and fits recurring pay-app gaps poorly, because you pay interest on the whole amount whether or not you're using it.
SBA 7(a) loans
SBA 7(a) loans go up to $5 million and can fund working capital, equipment, real estate and refinancing. For loans over $350,000, the maximum variable rate is the base rate plus 3%, which works out to 10.00% with prime at 7.00% (the Federal Reserve's H.15 release shows prime at 7.00% through November 17, 2026). For loans approved from October 1, 2026 with maturities over 12 months, the upfront guaranty fee is 2% of the guaranteed portion on loans of $150,000 or less and 3% from $150,001 to $700,000, with higher rates above that. Loans of 12 months or less pay 0.25%, and loans of $700,000 or less to businesses located in a rural area pay no upfront fee (SBA Information Notice 5000-881797).
Under an SBA policy effective March 1, 2026, every owner of a 7(a) or 504 applicant must be a U.S. citizen or U.S. national whose principal residence is in the U.S. Our SBA loans guide covers the rest of the eligibility rules.
SBA CAPLines: the Contract and Builders lines
CAPLines are SBA's 7(a) programs for short-term and cyclical working capital (SBA 7(a) terms). Three matter to contractors:
- Contract CAPLine finances the costs of one or more specific contracts, revolving or non-revolving. It suits a sub that has landed a job bigger than its normal line can carry.
- Builders CAPLine finances small general contractors building or rehabilitating residential or commercial property, with a maturity of up to 60 months plus the estimated construction time.
- Seasonal CAPLine finances seasonal increases in receivables and inventory, for contractors whose work bunches into the warm months.
Other CAPLines can run up to 10 years. Expect the lender to ask for the contract, a job budget and your WIP schedule.
Worked example: what a Contract CAPLine costs
Example inputs. A mechanical sub gets a $500,000 Contract CAPLine approved in November 2026, with a maturity over 12 months and a 75% SBA guaranty, the usual maximum for 7(a) loans over $150,000. The guaranteed portion is $375,000, so the upfront fee at 3% is $11,250 (assuming the business isn't in a rural area), and the variable rate can't exceed prime plus 3%, or 10.00% today. If the sub averages $250,000 drawn over a year at that cap, interest comes to about $25,000.
SBA 504 for a yard or shop, and the time SBA money takes
For a yard, shop or office you will occupy, an SBA 504 loan can finance up to $5 million (more for certain manufacturing and energy projects), and the borrower usually puts in at least 10% of the project cost. Long-term real estate debt also keeps your working capital intact, which your surety will notice.
SBA lists standard 7(a) processing at 5 to 10 business days* once the lender submits, but building the file (tax returns, WIP schedule, debt schedule, projections) takes longer. If the gap is next month, bridge it another way and apply for SBA money for next season.
Construction equipment financing
The machine is the collateral, so equipment financing is usually the easiest construction loan to get: The lender holds a lien on the excavator or truck and can repossess and sell it, which lets it lend to companies that would struggle to get unsecured money. Match the term to how long the machine will earn, not to the lowest payment on offer.
Used iron from a dealer or auction is financeable: Expect the lender to ask for the serial number, hours, an invoice or auction receipt, and sometimes an inspection; older machines usually get shorter terms. Our heavy equipment financing page covers the details.
Tax timing matters for big buys: For tax years beginning in 2026, Section 179 lets a business expense up to $2,560,000 of qualifying equipment, reduced dollar for dollar once purchases pass $4,090,000 (IRS Revenue Procedure 2025-32). The deduction can't exceed business income, while 100% bonus depreciation applies to qualifying property acquired after January 19, 2025. Quordx isn't a tax advisor, so ask your CPA which applies; see equipment financing and Section 179.
Decision rule: if a machine would sit idle most of the year, rent it and bill the rental to the job. If it works most weeks, finance it and keep your cash for payroll. Paying cash for iron is the most common way a contractor quietly shrinks its own bond line, as the next section shows.
Surety bonding and debt: how a loan changes your bond line
Public jobs and many private ones require surety bonds. On federal construction contracts over $150,000, the contractor must furnish performance and payment bonds, and contracts over $35,000 up to $150,000 require other payment protection (FAR 28.102-1). Your bonding capacity, meaning how big a job and how much total work a surety will back, depends heavily on your financial statements.
What the surety reads
The National Association of Surety Bond Producers says a surety will ask for at least three years of fiscal year-end statements, may require a CPA audit, and uses the balance sheet to judge your working capital (NASBP, How to Obtain Surety Bonds). It also wants evidence of a bank line for temporary shortfalls, and looks at what secures that line and how heavily you use it. Sureties generally look for an unsecured line, or one made possible by long-term financing of equipment or real estate, which in plain terms means machines and buildings on long-term debt, not payroll on debt due in a few months.
Worked example: four ways to fund the same company
Example inputs. A site contractor has $1,200,000 of current assets and $700,000 of current liabilities, so its working capital is $500,000. Here is what four funding choices do to that number at an assumed 9% rate, counting only the next 12 months of loan principal as current.
| Move | Effect on working capital | Working capital after |
|---|---|---|
| Buy a $200,000 excavator with cash | minus $200,000 | $300,000 |
| Finance the same excavator over 60 months | minus about $33,000 (first year's principal) | about $467,000 |
| Borrow $150,000 on a 36-month term loan | plus about $104,000 (cash in, less about $46,000 current principal) | about $604,000 |
| Borrow $150,000 due in six months | about zero, less fees (cash and debt are both current) | about $500,000 or less |
Short-term money adds no working capital, and its fees take some away: Long-term money adds working capital even though the total debt is the same. If you are trying to grow your bond line, talk to your surety agent before you take short-term debt in bid season, and put equipment and real estate on long-term financing.
The SBA Surety Bond Guarantee program
If a surety won't back you on its own yet, SBA's Surety Bond Guarantee program guarantees bid, performance and payment bonds on contracts up to $9 million, or up to $14 million for federal work. SBA charges no fee for a bid bond guarantee and 0.6% of the contract price for performance and payment bond guarantees. You still have to meet the surety's credit, capacity and character requirements.
WIP schedules and percentage-of-completion financials
The work-in-progress (WIP) schedule tells a lender or surety whether your jobs are making money. NASBP describes the quarterly version a surety expects: for each job, contract price, approved change orders, billed to date, cost to date, revised cost to complete, estimated final gross profit and anticipated completion date. Banks that lend to contractors ask for much the same.
Percentage-of-completion accounting: is the method the AICPA's construction audit guide recommends and most sureties prefer, per NASBP. On the common cost-to-cost version, percent complete is cost to date divided by estimated total cost, and that share of the contract is earned revenue. Comparing earned revenue with billings shows whether you are over or under billed.
Worked example: reading over and under billings
| Job | Contract | Est. total cost | Cost to date | Percent complete | Earned revenue | Billed to date | Over (under) billed |
|---|---|---|---|---|---|---|---|
| A | $1,000,000 | $850,000 | $510,000 | 60% | $600,000 | $680,000 | $80,000 over |
| B | $600,000 | $500,000 | $300,000 | 60% | $360,000 | $300,000 | $60,000 under |
Overbilling: (Job A) means you have billed ahead of the work. It is a liability, because the cash belongs to work you still have to do; a little is normal, but a company living on overbillings is spending money it needs to finish its jobs.
Underbilling: (Job B) means work done but not billed. It is an asset, but lenders read it with suspicion, because it can be billing lag, an unapproved change order or a cost overrun the estimate hasn't caught. It can't be borrowed against either, since unbilled work isn't an eligible receivable.
Why your tax return may not match your WIP
Federal tax law generally requires percentage-of-completion on long-term contracts, but exempts certain residential contracts and contracts expected to finish within two years by a contractor that meets the gross receipts test (26 U.S.C. 460(e)). For 2026, that test is average annual gross receipts of $32 million or less over the prior three tax years (IRS Revenue Procedure 2025-32, section 4.30). Many smaller contractors therefore file taxes on one method and produce CPA statements on another, so have your CPA write a short reconciliation for lenders who read both.
Merchant cash advances on long construction jobs: why progress billing makes them dangerous
A merchant cash advance buys a share of your future deposits for a fixed payback amount, collected by daily or weekly debits sized from your average deposits. That works for a business with steady daily sales. A contractor gets a few large checks a month, and they arrive late.
Worked example: the same job funded with an advance
Go back to the $480,000 subcontract. Say a funder offers $100,000 at a 1.40 factor rate, repaid over 126 business days: $140,000 in total, about $1,111 a business day (example terms, not market rates). The sub takes it on day one, and about 54 business days of debits, $60,000, go back to the funder before the GC's first check arrives on day 75.
So the advance covered only $40,000 of a $170,000 gap, and it made the low point worse: By month six the account is about $187,000 short, deeper than with no financing at all, because $140,000 has gone out against $100,000 that came in. The advance cost $40,000; the line of credit in the earlier example cost about $5,500 at an assumed 9%.
Stacking, reconciliation and the contract terms to read
Stacking is the usual next step: When a slow pay app leaves the account short, a second funder offers another advance, and two sets of debits come out of the same few checks. Read two merchant cash advances at once before signing a second one.
Some contracts include a reconciliation clause that adjusts payments to actual deposits, but you usually have to ask and document the drop. New York requires providers to disclose an estimated APR on sales-based financing offers of $2.5 million or less (23 NYCRR 600), so ask for that number wherever you are. The FTC has alleged that one funder kept debiting accounts after contracts were paid off and claimed no personal guarantee was required when the contracts said otherwise (FTC).
Watch for a confession of judgment, a signed admission that lets the funder get a judgment without a lawsuit. New York now allows one to be filed only in the county where the signer lived when signing or lives at filing (CPLR 3218); don't sign one without a lawyer reading it.
When an advance can make sense: a signed contract, a scheduled payment with a date, an amount sized to the gap rather than the contract, and no other advance in place. If you can't name the check that pays it off, don't take it.
Construction invoice factoring, in brief
Factoring sells an approved pay app to a factor, which advances part of it now and pays you the rest, less its fee, when the GC pays. It suits subs with creditworthy GCs who can't get a line yet, and it grows with your billing instead of your balance sheet. Retainage is generally not advanced, nothing is funded until a pay app is approved, and the GC is told to pay the factor directly.
Our construction factoring guide covers pay-app math, lien waivers, notices of assignment and what a construction-friendly factor looks for. Use it alongside this page if factoring is on your shortlist.
Business loans for contractors: GCs, specialty subs and 1099 trades
A GC carries the whole project's cash gap and most of the bonding; a specialty sub carries its own trade's gap and usually waits on the GC. Lenders underwrite each on who pays them, how reliably and how fast.
If you work as a 1099 subcontractor: you are usually a sole proprietor or single-member LLC paid on Form 1099-NEC. Banks and SBA lenders size the loan from your Schedule C net profit, so write-offs that cut your tax bill also cut what you can borrow, while revenue-based lenders lean on bank deposits. Run every job through a separate business account, and see business loans for the self-employed for the paperwork.
If your company is new but you aren't: equipment financing is the most realistic first loan, because the machine secures it and lenders weigh your years in the trade. Lines of credit and working capital loans generally want a track record of deposits under the company's own name.
What lenders check on a construction company
- WIP schedule and backlog: whether margins hold from quarter to quarter, and how much signed work is waiting.
- AR and AP agings: retainage on its own line, how concentrated your GCs are, and whether suppliers are getting paid.
- License and insurance: a current contractor license, general liability and workers' comp. A lapsed comp policy can end a bank application on its own.
- Liens and taxes: mechanic's liens your own suppliers have filed, payroll tax liens and existing UCC filings.
- Bank statements: how deposits arrive, overdrafts, and any daily debits to other funders.
- Bonding: a contractor a surety already backs has passed a second underwriting.
Red flags that stop files: large underbillings on jobs near completion, payroll taxes behind, a stack of advances, and in-house statements when the request calls for CPA-reviewed numbers. Fix what you can before you apply, and explain the rest in a short cover note.
Document checklist for a construction business loan
- WIP schedule for the last quarter end, in the NASBP format above
- AR aging and AP aging, with retainage shown separately
- Backlog list and copies of signed contracts for your largest jobs
- A bonding letter from your surety stating your single-job and aggregate limits, if you are bonded
- Two to three years of business tax returns and year-end financial statements (CPA-reviewed or audited for larger lines)
- A current interim balance sheet and income statement
- Recent business bank statements
- A debt schedule listing every loan, line, lease and advance with balance and payment
- Equipment list with serial numbers, and quotes or invoices for anything being financed
- Contractor license, general liability and workers' comp certificates
- Owner personal financial statement and personal tax returns (for SBA loans and most bank lines)
Contract and cost traps in contractor financing
- Personal guarantees. Most business lenders ask owners to sign one, which puts personal assets behind the business debt. Read what a personal guarantee means before you sign.
- Blanket UCC liens. Many lenders file a lien on all business assets. Under UCC 9-322, conflicting security interests generally rank by time of filing or perfection, so the first blanket filer can block or outrank a later factor or line lender. Ask lenders to limit the lien to what they are financing where they will.
- Cross-default and covenants. A default on one loan can trigger default on others, and a covenant breach can freeze your line in the middle of a job.
- Borrowing base surprises. Retainage, aged GCs, concentrations and bonded jobs can make availability far smaller than the line limit.
- Prepayment terms. SBA 7(a) loans with maturities of 15 years or more charge 5%, 3% and 1% in years one to three when 25% or more is prepaid. An advance's payback is usually fixed, so paying early often saves nothing unless the contract says so.
- Fees beyond the rate. Origination, unused line, field exam, lockbox and documentation fees all add up, so compare offers in total dollars over the life of the money.
- Lease end terms. A $1 buyout lease is a purchase in all but name; a fair market value lease ends with a buyout price you don't know yet.
Seasonality: funding the slow months
Weather and owner budgets bunch construction billings into part of the year, while insurance, equipment payments and key staff run all year. The slow season is when a line matters most and, for some lines, when it shrinks.
A borrowing base line shrinks exactly when billings fall: In the borrowing base example above, $520,000 of receivables supported $320,000 of availability. If winter receivables drop to $200,000, with $40,000 of that retainage, the same 80% advance rate supports only $128,000.
What works better: a cash-flow line sized on your annual statements, a Seasonal CAPLine, or cash set aside from the busy months. Renew your line while your numbers look strongest rather than in the off-season, and ask equipment lenders whether they offer seasonal or skip-payment schedules before you sign, not after a slow winter.
Which construction loan fits you: a decision checklist
- If your gaps are payroll between pay apps on steady work, get a revolving line sized to your low point.
- If you can't get a line yet but bill creditworthy GCs, factor approved pay apps while you build history.
- If one contract is bigger than your line can carry, ask for an increase or an SBA Contract CAPLine, after talking to your surety.
- If your bond line is the constraint, put equipment and real estate on long-term debt and keep short-term debt low.
- If your revenue is seasonal, use a cash-flow line or Seasonal CAPLine, renewed in season.
- If you are considering a merchant cash advance, take it only with a signed contract, a dated payment that pays it off, an amount sized to the gap and no other advance open.
How to apply for a construction business loan, step by step
- Map the gap. Lay out the next 13 weeks of payroll, supplier payments and expected pay app collections from your WIP schedule, and find the low point.
- Pick the product by need, using the table at the top of this page. Size the request to the low point plus a cushion, not to the contract.
- Assemble the package from the checklist above. A clean WIP schedule and an AR aging with retainage split out do more for an application than anything you can say about it.
- Call your surety agent if you are bonded, before you sign anything short-term.
- Apply and answer questions fast, especially on your largest GCs, any job with fading margin and any existing advances.
- Compare offers side by side: total cost in dollars, the payment schedule against your pay app calendar, collateral, guarantees, covenants and prepayment terms.
- Read the security agreement and UCC language, then sign, and send borrowing base certificates and statements on time after funding, because late reporting is a default too.
What happens next: non-bank lenders often decide within 24 to 48 hours*, with funding typically 3 to 7 business days* after documents are complete. Bank lines take longer because of covenant setup and, on asset-based lines, a field exam. SBA loans take longest because of preparation.
Applying through Quordx as a contractor
Quordx is a broker, not a lender. One application, about 10 minutes, goes to a network of 75+ lenders, and those whose rules fit a contractor's file can come back with offers: a revolving line, a term loan, equipment financing, factoring of approved pay apps or SBA money, depending on your numbers. Each lender decides and sets its own terms, and many respond within 24 to 48 hours*.
The lender pays Quordx if a deal funds, so the application costs you nothing. Quordx doesn't place surety bonds; for bonding, work with a surety agent. If your WIP schedule or statements are behind, catch them up first, because they will shape every offer you get.
Questions Business Owners Ask Before Applying
What is the difference between a construction loan and a construction business loan?
A construction loan usually finances building a specific property, with money released in draws as the work goes up. A construction business loan funds the contractor's own operations: payroll, materials, equipment and the gap between costs and pay apps. Small GCs building for sale can look at SBA's Builders CAPLine; most working capital lenders don't fund speculative building.
Will a lender count retainage when sizing my line of credit?
Usually not while it is still held, because it isn't payable until closeout. Asset-based lenders typically leave it out of the borrowing base, and cash-flow lenders treat it as a slow receivable. Show it on its own line in your AR aging with a release date for each job.
Can a new construction company get a business loan?
Equipment financing is the most realistic first loan, because the machine secures it and lenders weigh your experience in the trade. Lines of credit and working capital loans generally want a track record of deposits in the company's own name. SBA loans can work for newer businesses with a strong plan, but they take longer to prepare.
Do I need collateral for a construction business loan?
Equipment loans are secured by the machine and factoring by the receivables. Most other business lenders file a UCC lien on business assets and ask owners for a personal guarantee, even when no specific asset is pledged. Ask each lender exactly what its lien covers before you sign.
How fast can a construction company get funded?
Equipment loans and working capital from non-bank lenders are the fastest: lenders typically decide within 24 to 48 hours*, and funding typically follows in 3 to 7 business days* once documents are complete. Bank lines take longer because of covenant setup and field exams. SBA loans take longest because of preparation, even though SBA lists standard 7(a) processing at 5 to 10 business days*.
Will a business loan hurt my bonding capacity?
It depends on the term. Short-term debt adds cash and a current liability at the same time, so it adds no working capital, and its fees reduce it. Long-term debt, such as equipment financing or a multi-year term loan, adds working capital because most of the balance isn't due within a year.
Can a 1099 subcontractor get a business loan?
Yes, usually as a sole proprietor or single-member LLC. Banks and SBA lenders size the loan from your Schedule C net profit, while revenue-based lenders look mainly at business bank deposits. Run all job income through a separate business account so lenders can see it.
Can I get a line of credit if most of my work is bonded?
Yes, but some lenders exclude bonded-job receivables from a borrowing base, because a payment-bond surety that pays your suppliers can claim the contract funds ahead of the bank. A cash-flow line sized on your statements avoids that problem. Sureties also like to see a bank line in place, so the two usually go together.
Apply for Funding
No obligation ยท Initial inquiry doesn't impact credit ยท Takes about 10 minutes
Sources
- SBA: 7(a) loan program terms, conditions and eligibility (CAPLines, rate caps, processing times)
- SBA: Surety bonds (Surety Bond Guarantee program limits and fees)
- NASBP: How to Obtain Surety Bonds, an introduction to contract surety bonding (financial statements, WIP schedule, bank lines)
- OCC Comptroller's Handbook: Asset-Based Lending (advance rates, ineligible receivables, concentrations, lockboxes)
- FAR 32.103: Progress payments under construction contracts (retainage cap)
- California Civil Code 8811: 5% retention cap on private works contracts from January 1, 2026
- Federal Reserve: H.15 Selected Interest Rates (bank prime loan rate)
- 26 U.S.C. 460: Special rules for long-term contracts (percentage-of-completion and the small contractor exception)

Written by
Cody Dreis
Founder, Quordx Capital
Read full bio
Related articles
Keep exploring industry financing
Quordx Capital is a business funding broker, not a lender. Lenders make every credit decision and set the rate, fees and terms, and not every business qualifies. Quordx may be paid by a lender when a deal funds. Full disclosures

