Loans for Construction Companies: Which One Fits Each Cash Gap
Construction companies borrow through six main products: equipment financing, business lines of credit, factoring of approved pay apps, short-term loans, SBA loans and merchant cash advances. Which one fits depends on the gap you are filling, because mobilizing a new job, waiting out retainage, buying a machine and building a shop are four different problems. The mistake that hurts contractors most is sizing a loan to the contract instead of to the cash gap, or repaying a daily-debit advance out of income that arrives as a few large checks a month. Below is the math for a typical subcontract, a comparison of every option, and what lenders and sureties look at.
The short version: Finance machines with equipment loans, the weeks between costs and pay apps with a line of credit or pay-app factoring, and buildings or major growth with SBA money. Size any working capital request to your peak cash gap, which on most jobs is a fraction of the contract value. Treat a merchant cash advance as a last resort for a short gap with a known payoff date, because its debits keep running while the GC takes 45 days to pay.
Part of our industry guide: Industry Financing.
Last updated · Reviewed by Cody Dreis
50+ Lenders|Decisions typically in 24 to 48 hours

Why construction companies run short of cash on profitable jobs
A contractor pays for labor every week and for materials on 30-day supplier terms, but gets paid monthly on a progress billing that the GC or owner settles 30 to 60 days later. Part of every billing is held back as retainage until the project closes out. Subcontractors often work under pay-when-paid clauses, so their check waits on the owner paying the GC.
The result is a job that shows a profit and drains your bank account for months: Growth makes it worse, because every new job opens another gap before the last one has closed. That is why lenders who understand construction ask how much you need at the low point, not how big the contract is.
The billing side has its own rules: AIA G702 and G703 pay applications, retainage, lien waivers and notices of assignment. Our guide to accounts receivable financing for construction covers those in depth, including a worked example of factoring a pay app, so this page focuses on everything else in the funding menu.
Mobilization: how much working capital a construction job really needs
Here is an example with stated assumptions, not a quote. An electrical sub signs a $480,000, six-month subcontract. It bills $80,000 of work at each month end, the GC holds 10% retainage and pays 45 days after each billing. The sub's costs run $68,000 a month: $40,000 of labor paid weekly and $28,000 of materials bought at the start of each month on 30-day supplier terms.
| Month | Costs paid | Payments received | Cash position at month end |
|---|---|---|---|
| 1 | $68,000 | $0 | minus $68,000 |
| 2 | $68,000 | $0 | minus $136,000 |
| 3 | $68,000 | $72,000 (pay app 1, day 75) | minus $132,000 |
| 4 | $68,000 | $72,000 | minus $128,000 |
| 5 | $68,000 | $72,000 | minus $124,000 |
| 6 | $68,000 | $72,000 | minus $120,000 |
| 7 | $0 | $72,000 | minus $48,000 |
| 8 | $0 | $72,000 | plus $24,000 |
| Closeout | $0 | $48,000 retainage | plus $72,000 |
The low point is about $156,000, just before the first check lands on day 75: That is the $136,000 spent in months one and two plus roughly half of month three's $40,000 payroll. The gap barely shrinks for the rest of the job, and the job's $72,000 profit doesn't turn into cash until month eight and closeout.
Decision rule: a quick estimate of the gap is your monthly cost multiplied by the months from first cost to first payment, here $68,000 times about 2.3. If your request is close to the contract value, it is sized wrong. A lender will see that, and so will you when the payments start.
Estimate your funding
Answer a few questions about your business to see a likely range.
Construction loan options compared
| Product | Best for | Repaid from | Watch out for |
|---|---|---|---|
| Equipment financing | Excavators, skid steers, trucks, lifts, trailers | Monthly payments over the machine's useful life | Buying iron you will use a few weeks a year |
| Business line of credit | Mobilization, materials, payroll between pay apps | Pay apps as they clear, then redraw | Lenders usually leave retainage out of the borrowing base |
| Pay-app factoring | Subs with approved billings owed by a strong GC | The GC pays the factor | No advance before the first pay app is approved |
| Short-term loan | One dated gap, such as a new job's first 10 weeks | Fixed weekly or monthly payments | Payments start before the job pays |
| SBA 7(a) or CAPLine | A yard or shop, an acquisition, contract-specific working capital | Long-term monthly payments | Real bookkeeping and weeks of preparation |
| Merchant cash advance | A short gap with a signed contract and a known payoff | Daily or weekly debits from deposits | Debits continue while the GC holds your money |
Construction business line of credit
A line fits the mobilization pattern better than any lump sum: In the example above, the sub draws for payroll and materials in months one and two, pays the line down as each $72,000 check arrives, and draws again for the next job. You pay interest only on what is drawn, and the limit is there for the next job without a new application.
Lenders that offer lines to contractors usually want a track record of completed jobs, tax returns that show a profit, and books clean enough to produce a WIP schedule. Receivables-based lines set a borrowing base from your AR aging, and retainage is usually excluded from it, so list retainage separately when you send the aging.
If you can't qualify for a line yet, a short-term loan sized to one job's gap is the fallback. Our page on the business line of credit explains draws, renewals and how limits are set.
Construction equipment financing
The machine is the collateral, so equipment is usually the easiest construction loan to get: The lender holds a lien on the excavator or truck and can repossess and sell it, which lets it lend to companies that would struggle to get unsecured money. Match the term to how long the machine will earn, not to the lowest payment on offer.
Used iron from a dealer or auction is financeable: Expect the lender to ask for the serial number, hours, an invoice or auction receipt, and sometimes an inspection or appraisal. Older machines usually get shorter terms. Our heavy equipment financing page covers the details.
Tax timing matters for big buys: For tax years beginning in 2026, Section 179 lets a business expense up to $2,560,000 of qualifying equipment, reduced dollar for dollar once purchases pass $4,090,000 (IRS Revenue Procedure 2025-32). The deduction can't exceed business income, while 100% bonus depreciation applies to qualifying property acquired after January 19, 2025. Ask your CPA which applies; see equipment financing and Section 179.
Decision rule: if a machine would sit idle most of the year, rent it and bill the rental to the job. If it works most weeks, finance it and keep your working capital for payroll.
Bonding capacity vs credit: why the wrong loan can shrink your bond line
Public jobs and many private ones require surety bonds. On federal construction contracts over $150,000, the prime contractor must furnish a performance bond and a payment bond before the award (40 U.S.C. 3131, with the threshold adjusted for inflation in FAR 28.102-1). Your bonding capacity, the size of work a surety will back, depends heavily on your financial statements.
Sureties look hard at working capital and net worth, and short-term debt reduces working capital: A loan or advance due within a year is a current liability, so it lowers working capital even though the cash came in. Equipment debt is spread over several years, so only the next twelve months of payments count as current. A company that funds payroll with short-term advances can find its bond line smaller at the exact moment it wants to bid bigger work.
If you are building bonding capacity: talk to your surety agent before taking on short-term debt during bid season, and prefer long-term structures where you can. SBA's Surety Bond Guarantee program backs bid, performance and payment bonds for small contractors on contracts up to $9 million (up to $14 million for federal contracts). SBA charges no fee for a bid bond guarantee and 0.6% of the contract price for performance and payment bond guarantees.
SBA loans for construction companies
SBA 7(a) loans go up to $5 million: and can pay for working capital, equipment, real estate and refinancing (SBA). For loans over $350,000, the maximum variable rate is the base rate plus 3%, which works out to 10.00% with prime at 7.00% as of October 2026. For loans approved from October 1, 2026, the upfront guaranty fee is 2% of the guaranteed portion for loans of $150,000 or less and 3% from $150,001 to $700,000.
CAPLines are the SBA programs built for contractors: A Contract CAPLine finances the costs of specific contracts, including allocable overhead, and can revolve. A Builders CAPLine helps small general contractors build or rehabilitate property for resale, with a term of up to 60 months plus the construction period. Other CAPLines can run up to 10 years (SBA 7(a) terms).
For a yard, shop or office you will occupy, an SBA 504 loan can finance up to $5 million (more for certain manufacturing and energy projects). Under an SBA policy effective March 1, 2026, every owner of a 7(a) or 504 applicant must be a U.S. citizen or U.S. national whose principal residence is in the U.S. Our SBA loans guide covers the rest of the rules.
The cost is preparation time: SBA lists standard 7(a) processing at 5 to 10 business days once the lender submits, but lenders want tax returns, a WIP schedule, a debt schedule and projections first. If the gap is next month, apply for the SBA line now for the next season and bridge this one another way.
Merchant cash advances for construction companies: why progress billing makes them risky
A merchant cash advance buys a share of your future deposits for a fixed payback, collected by daily or weekly debits sized from your average deposits. That works for a business with steady daily sales. A contractor gets a few large checks a month, and they arrive late.
Run it against the example job: Say a funder offers $100,000 at a 1.40 factor rate, paid back over about six months, or 126 business days. That is $140,000 in total, about $1,111 a business day. The sub takes it on day one, and in the 52 or so business days before the GC's first check arrives, about $57,800 goes back to the funder. The advance covered only about $42,000 of the $156,000 gap, at a cost of $40,000.
Then stacking starts: When the next slow pay app leaves the account short, a second funder offers another advance, and two sets of debits now come out of the same few checks. Some advance contracts include a reconciliation clause that adjusts payments to actual deposits, but you have to request it and document the drop. Read two merchant cash advances at once before signing a second one.
When an advance can make sense: a signed contract, a scheduled draw with a date, an amount sized to the gap rather than the contract, and no other advance in place. If you can't name the check that pays it off, don't take it.
Contractor business loans for specialty trades and 1099 subcontractors
General contractors and specialty subs borrow differently. A GC carries the whole project's cash gap and most of the bonding; a sub carries its own trade's gap and usually waits on the GC. Lenders underwrite each one on who pays them, how reliably and how fast.
If you work as a 1099 subcontractor: you are usually a sole proprietor or single-member LLC paid on Form 1099-NEC, and lenders will read two things: your Schedule C net profit and your bank deposits. Banks and SBA lenders size the loan from Schedule C, so heavy write-offs that cut your tax bill also cut what you can borrow. Revenue-based lenders lean on deposits, which is why a separate business bank account matters more than anything else you can fix this month.
Our page on business loans for the self-employed covers documents for owners without W-2 income.
What lenders check on a construction company
- WIP schedule and backlog: contract value, cost to date, billed to date and cost to complete for each job. Overbilling means you took cash for work not done; underbilling means you are financing the owner.
- AR aging with retainage on its own line, plus expected release dates.
- Customer concentration: one or two GCs making up most of your revenue makes AR lenders cautious.
- License and insurance: state contractor license, general liability and workers' comp. A lapsed comp policy can end a bank application.
- Liens and taxes: mechanic's liens, payroll tax liens and existing UCC filings.
- Bank statements: how deposits arrive, whether payroll runs from the business account, and any daily debits to other funders.
What Quordx can place for a contractor, and what it can't
Quordx is a broker, not a lender: you fill out one application, about 10 minutes, and Quordx sends it to lenders whose rules fit a contractor's file. For a construction company, that generally means equipment financing starting around $15,000, term loans, lines of credit and short-term working capital, and factoring of approved pay apps for subcontractors. Lenders Quordx works with generally look for around $17,000 a month in revenue and about a year in business for the cash-flow products, and SBA loans through Quordx generally start around $400,000.
What doesn't fit: pay-app factoring through Quordx generally does not cover general contractors or bonded jobs, some working capital lenders restrict construction or cap how many advances you can already have, and Quordx does not place surety bonds or smaller SBA loans and CAPLines. For those, use a surety agent and SBA's Lender Match. Lenders make every decision; they typically answer within 24 to 48 hours, and the lender, not the business, pays Quordx if a deal funds. Contractors based in Virginia, Connecticut, Missouri or North Dakota are outside the states Quordx serves.
Questions Business Owners Ask Before Applying
What is the difference between a construction loan and a construction business loan?
A construction loan usually finances building a specific property, with money released in draws as the work goes up. A construction business loan funds the contractor's operations: payroll, materials, equipment and the gap between costs and pay apps. Small GCs building homes for resale can look at SBA's Builders CAPLine; most working capital lenders don't fund speculative building.
Will a lender count retainage as an asset when sizing my loan?
Usually not while it is still held, because it depends on project completion and closeout. Lenders treat it as a separate, slower receivable. Show it on its own line with a release date for each job, and plan its cash need on its own.
Can a new construction company get a loan?
Equipment financing is the most realistic first loan, because the machine secures it and the lender weighs your industry experience. Lines of credit and working capital loans generally want a year or more of deposits. An owner with years in the trade but a new company can also look at SBA loans, which accept newer businesses with a strong plan.
Do I need collateral for a construction business loan?
Equipment loans are secured by the machine. Most other business lenders file a UCC lien on business assets and ask owners for a personal guarantee, even when no specific asset is pledged. Factoring is secured by the receivables themselves.
How fast can a construction company get funded?
Equipment loans and working capital from non-bank lenders are the fastest; lenders typically decide within 24 to 48 hours, and funding typically follows in 3 to 7 business days once documents are complete. SBA loans take longer because of preparation, even though SBA lists standard 7(a) processing at 5 to 10 business days. Factoring starts only when a pay app is approved.
Apply for Funding
No obligation · Initial inquiry doesn't impact credit · Takes about 10 minutes
Sources
- SBA: 7(a) loan program terms, conditions and eligibility (CAPLines, rate caps)
- SBA: Surety bonds (Surety Bond Guarantee program)
- 40 U.S.C. 3131: Bonds of contractors of public buildings or works (Miller Act)
- IRS Revenue Procedure 2025-32 (2026 Section 179 limits, section 4.24)
- Federal Reserve: FOMC minutes, September 15-16, 2026

Written by
Cody Dreis
Founder, Quordx Capital
Read full bio
Related articles
Keep exploring industry financing
Quordx Capital is a business funding broker, not a lender. Lenders make every credit decision and set the rate, fees and terms, and not every business qualifies. Quordx may be paid by a lender when a deal funds. Full disclosures